PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

1st block course at the 2nd floor detention cell Facing East.jpg 3rd floor interior metal framing Facing East.jpg 3rd floor interior metal framing Facing South.jpg 4th floor interior metal framing Facing South-West.jpg Electrical split wire at for the 3rd floor motorized dampers Facing South.jpg Installed low roof curbs Facing East.jpg Installed roof curbs at the high roof Facing West.jpg Installing storm piping at the 3rd floor Facing North.jpg Storm piping at the 4th floor for the Low Roof Facing East.jpg
Previous pageNext page Electrical split wire at for the 3rd floor motorized dampers Facing South
Electrical split wire at for the 3rd floor motorized dampers Facing South